Contact Info

  • shuanghao@cap199.com
  • 0086-15168691564
  • 0086-576-89166850
  • No. 12, Yonggu Road, Jiangkou Street, Huangyan,Taizhou,Zhejiang,China
Pepper bottle lid mould

Pepper bottle lid mould


1.MOULD  DESCRIPTION:

1.Cavity:1-16

2.Mould base material :P20 , 45# , 4CR13 , .ECT

3.Core&Cavity material : S136,718, P20,2378,2316,4CR13,P20 .ECT

4.Runner: Cold /Hot (LOCAL BRAND,HASCO,YUDO,HUSKY .ETC)

5.Life time:3,000,000 shots

6.Quick T1 time:25-40 days

7.Package:wooden case  

2.MOULD  MANUFACTURE  PROCESS:

Cap Mould : grinding→fly-cutter →CNC Milling→drilling→lathe→boring lathe→electric pulse →fine fly-cutter→polish→electroplate→install 

Preform Mould: grinding→drilling→lathe→boring lathe→fine fly-cutter→polish→electroplate→install

Need vale ,itself-locking :new advanced needle vale gate system.each cavity is self-lock independently to ensure low decent ration of product.

The excellent hot runner design assures uniform heating and greatlyimproves the quality of plastic products 

3.AFTER  SALE  SERVICE:

Any mould problem,we will provide free maintenance service

微信图片_20220107083418.jpg

6. FLOW CHART

1Sample or 2D,3D drawing from customer
2Bulid 2D,3D drawing
3CAD mould design
4Send drawing to customer to confirm
5Parts inspection/CNC machining/EDN machining
6Mould assembly
7Mould test 
8Send sample to confiom 
9Dilver the mould
微信图片_20220107083437.jpg